Complete the
attached Application/Permit Form and submit with the construction plan, type of
materials to be used, and design layout to:
Jayne
Averitt
WLCD
Vice President
940
W Kamleifer Drive
Nineveh,
IN 46164
Email: javeritt848@gmail.com
No shoreline disturbance within four feet
of shoreline is allowed during construction.
Only vegetation removal necessary for construction is allowed. Erosion control fencing or other type of
erosion control material is required during construction to avoid sediment
washing into the White Lake. If lake
owner’s lot requires excavation, see Prince’s Lake Town Ordinance EROSION AND SEDIMENT CONTROL 152.100
·
No construction is allowed on White Lake, nor
shall any permanent structures be located upon White Lake, until said
construction and/or structure permit has been approved by the WLCD Board of
Directors. Freeholders seeking to construct or place structures upon White Lake
shall complete permit application and submit drawings, plans and specifications
(including type of material to be used) describing
the structure and the construction to be undertaken to the WLCD Board for
approval.
·
White Lake is owned by the WLCD. As such, the District imposes rules and
regulations concerning construction of docks and any other structure attached
to the lake bottom, as well as construction on the shoreline and areas within
the White Lake watershed. No one shall alter the shoreline at any time.
·
All floating docks, swim platforms, and other
permanent structures not permanently affixed to the lake bed are prohibited. No
structure extending into White Lake shall be attached to the shoreline by
mooring cables or similar tethering devices.
·
For shoreline stabilization, please consult the
Board for best methods to be used prior to making application.
White Lake Conservancy District
Application/Permit for Shoreline Construction Projects
LAKE
OWNER INFORMATION
Applicant (Lake Lot Owner)
|
|
Lot Number(s)
|
|
Lot Street Address
|
|
Lake Owner’s Telephone Number
|
|
Lake Owner’s Email Address
|
|
CONTRACTOR
INFORMATION
Contractor Name
|
|
Company Name
|
|
Mailing Address
|
|
Telephone Number
|
|
Email Address
|
|
Licensed Contractor
|
Yes ______
No_______
|
License ID#
|
|
Anticipated Start and End Construction Dates
Start Date
|
|
End Date
|
|
WLCD to complete:
Application Number
|
|
Date Issued
|
|
WLCD
Board Member Signature/Date
_______________________________________ Date:_________________________________
_______________________________________ Date:_________________________________
_______________________________________ Date:_________________________________